Measurement
The surveyor measures the opening at three points, checks the level of the walls and floor, the opening direction, and the wall thickness for the frame.
30–40 minutesFive stages, each one clear about what we do and what's needed from you.
The surveyor measures the opening at three points, checks the level of the walls and floor, the opening direction, and the wall thickness for the frame.
30–40 minutesOn site we show samples of the door leaf and hardware, and calculate the full amount including extensions and dismantling. The estimate stays with you.
same dayThe order goes to the factory in your size and color. Lead time depends on the model — we give the exact date in the estimate.
by arrangementWe arrive on the agreed day, remove the old door, and take out the debris. The floor and walkway are covered with film.
1–2 hoursWe set the frame level, hang the door leaf, adjust the hardware, clean up after ourselves, and sign the acceptance certificate with a warranty.
from 2 hours